Post-doctoral Workstation Set Up at Yiyang Group
Post-doctoral Workstation Set Up at Yiyang Group
出处
《橡塑机械时代》
2007年第2期23-23,共1页
Rubber Plastics Machinery Times
-
1严昂,欧晓光,罗晖.GE Innova 3100血管机的AW工作站故障维修1例[J].医疗卫生装备,2009,30(9):118-119.
-
2Xu Shuqin (Institute of Material Science and Engineering,Taiyuan University of Technology) Michael (Technische Universitaet Muenchen,85747 Germany) Thomas Pyttel (ESI GmbH, Eschborn, 65760 Germany).FEM SIMULATION AND EXPERIMENTAL RESEARCH ON THE SHEET BLANKING[J].Chinese Journal of Mechanical Engineering,2001,14(3):254-258. 被引量:1
-
3N.Barathwaj,P.Raja,S.Gokulraj.Optimization of assembly line balancing using genetic algorithm[J].Journal of Central South University,2015,22(10):3957-3969. 被引量:6