摘要 根据下涧口水库的工程地质情况,结合水库大坝实际运行状况分析了砌石拱坝存在的主要病害问题,提出了针对坝体拉应力超强、重力墩稳定性不足等方面的除险加固初步方案,在技施设计中分析了初步方案的种种不足并结合工程自身的特点对方案进行了优化设计,使各方面的指标达到了规范的要求,在提高了工程安全性能的同时节省了施工工程量,同时给出了除险加固的具体措施,可供类似工程参考。 According to the engineering geology situation about the Xiajiankou reservoir, this paper analyses the main operation problems combined with the actual running conditions of the dam, and put forward principium program in connection with exceed sufferance intensity of tensile stress and lack stability of gravity frusta for maintenance and strengthening whose shortages are indicated during the construction design. The characteristics of the engineering are used to optimize the program to make every index attain to the requiring of criterion , enhance the safety performance and save the engineering work load at the same time, and concrete mea sures are given for reference to similar projects.
出处 《中国农村水利水电》 北大核心 2007年第1期111-114,117,共5页 China Rural Water and Hydropower
关键词 砌石拱坝 除险加固 方案优化 cemented masonry arch dam maintenance and strengthening program optimization
  • 相关文献

参考文献3

  • 1重庆市巴南区下涧口水库枢纽除险加固工程初步设计报告[R].四川大学工程设计研究院,2002.
  • 2四川省水利电力局.砌石拱坝建设[M].成都:四川人民出版社,1980.
  • 3SL25-91,浆砌石坝设计规范[S].