热轧厂在轧制难度大的产品时,引进的35kV右母线滤波装置经常过流跳闸,并影响主变压器跳闸。通过现场测试,对过流跳闸原因进行综合分析,确定了设备优化改造对策。经1年多时间的实践考核证明改造是成功的。
Overcurrent trip-off often happens to the 35kV right busbar filter and affects the main transformer when turning out high-tech products.The comprehensive analysis is made on the reasons of overcurrent trip-off by site measurement,so as to determine the measures for the optimized modernization of the device,which has been proved successful over one year's practice.
出处
《宝钢技术》
CAS
1996年第6期21-23,45,共4页
Baosteel Technology