盾构机穿越高速铁路的施工 被引量:18

Tunnel Boring across underneath High-speed Railways by Shield Machines
在线阅读 下载PDF
导出
摘要 介绍了盾构机首次穿越高速铁路轨道群的施工情况。重点叙述了工程客观条件、施工难点以及针对工程具体情况在人员、材料、设备、掘进参数设计、监测等方面采取的施工措施。施工结果表明在采取这些措施后,地面沉降能够得到有效控制,从而保证铁路安全。 The tunnel boring across underneath the tracks of high-speed railways by shield machines is presented in the paper, with the emphasis being placed on the works conditions, construction difficulties and countermeasure taken in respect of manpower, materials, equipment, boring parameter design and monitoring. The results demonstrate that, with the mentioned countermeasures, the surface subsidence has been effectively controlled and the safety of the railway has been guaranteed.
作者 刘英城
出处 《隧道建设》 2006年第A02期47-49,84,共4页 Tunnel Construction
关键词 地铁 盾构 下穿高速铁路 施工措施 沉降控制 Metro shield machine boring across underneath high-speed railway construction countermeasure subsidence control
  • 相关文献

同被引文献59

引证文献18

二级引证文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部