摘要
分析了水电站进水口工作闸门埋件安装过程中遇到的问题及解决方法。
The problem come forth in the installation process of imbed parts of slab gate at the inlet of hydropower station and its treatment were analyzed.
出处
《西北水力发电》
2006年第5期95-96,共2页
Journal of Northwest Hydroelectric Power
关键词
闸门埋件
安装
测量
调整
imbed parts of slab gate installation measurement adjustment