三峡电站机组蜗壳直埋方案仿真模型试验研究 被引量:6

Experimental Research on Spiral Case of Three Gorges Power Station's Unit with Directly Burying Scheme
在线阅读 下载PDF
导出
摘要 三峡电站机组蜗壳HD(H表示水头,D表示蜗壳直径)值高,外围混凝土相对较薄,结构受力条件复杂。其埋设方式关系到机组的安全稳定运行。试验针对右岸电站15#机蜗壳直埋方案,运用仿真模型试验技术,采用1∶12几何比尺制作钢筋混凝土整体模型。试验研究了在主要荷载作用下,结构的应力、应变和裂缝开裂状况,以及重复荷载对结构应力和裂缝开展的影响。并通过超载试验研究了混凝土裂缝的扩展规律和结构的承载能力。试验研究证实此直埋方案是可行的,结构是稳定的。 The spiral case of Three Gorges Power Station's unit is characterized by high water head and big diameter, besides the exterior concrete layer of spiral case is relatively thin and loading conditions of spiral case are complicated. Whether the unit can work safely and stably depends on the burying scheme to obtain success. Employing the simulation model experiment technology can simulate the directly burying scheme of the No. 15 unit's scroll case on the right-bank power station. The model is made of reinforced concrete with a scale 1 : 72. The experiment reseaxches mainly include stress, strain, the crack's degree of the structure and the influence of the repeatable loads on structure stress. According to the over-loading experiment, the rule of crack stretching out and the bearing capacity of structure are also studied. The research results show that this directly burying scheme is feasible, and the structure stable.
出处 《长江科学院院报》 CSCD 北大核心 2007年第1期47-50,共4页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 水电站 蜗壳 仿真模型 裂缝 Three Gorges Power Station hydropower station spiral case simulation model crack
  • 相关文献

参考文献3

  • 1DL/T 5057-1996,水工混凝土结构设计规范[S].
  • 2中国土木工程学会混凝土及预应力混凝土分会,等.钢筋混凝土结构裂缝控制指南[M].北京:化学工业出版社,2004.
  • 3黄薇,陈进.三峡厂房蜗壳充水打压方案仿真模型试验报告[R].武汉:长江科学院,2001.

共引文献6

同被引文献79

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部