摘要
船闸底板常规施工方法对底板的工作状态不利,为改善底板的工作条件,提出了预留宽缝的施工方法。通过对原型观测资料的分析及非线性有限元方法的模拟计算,论证不同施工方法对船闸结构的底板工作状态影响较大.指出底板预留宽缝的施工方法是解决软土地基上船闸结构底板开裂的一种有效的方法。
The auther has analysed a vast amount of measurement data, and calculated the lock structure construted by different method with nonline finite - element method, point out the different construction method has a great influence uPOn lock floor stucture on soft foundation, proved that the construction scheme of setting up construction joints in large floors is an effective way to prevent the thick lock floor on soft foundation from cracking.
出处
《长沙交通学院学报》
1996年第2期75-81,共7页
Journal of Changsha Communications University
关键词
船闸
有限元
工程施工
底板
预留宽缝
lock
construction method
U - frame structure
finite - element method