摘要 市场条件下,由于不确定因素对市场经济运行的影响,输电网的扩展规划必须考虑发电公司和用户的需求,减缓输电系统阻塞,促进市场的公平竞争。首先以电力联营市场模式为研究背景,针对不确定因素作用下可能的未来场景,基于最优潮流的输电网边际定价模型,提出了以投资成本和运行成本为优化目标的输电网静态规划模型;然后基于奔德斯(B enders)分解算法先求解出各个典型场景下输电网规划优化方案,再根据决策理论中的最小最大悔则进行多场景规划决策;最后在IEEE-24节点系统上进行了仿真计算。与确定性输电网规划方法相比,该模型计及了电网规划与经济运行中不确定因素的影响,从而能更有效地指导市场环境下输电网规划综合决策,提高规划系统经济性能。 In deregulated and competitive power market, it is important to expand or strengthen transmission network for delivering power from generators to loads under uncertainties and providing a fair environment to all market participants. A new comprehensive decision strategy for transmission expansion planning under a competitive pool-mode market environment is therefore presented in this paper. In the proposed optimal strategy, a new transmission planning model is developed with Benders decomposition method considering a variety of market driven future scenarios, while a decision analysis scheme is incorporate to minimize the total planning cost and operating cost of the selected plans. The proposed approach is applied to IEEE 24-bus test system to illustrate that the method is feasible and effective for solving the transmission expansion planning problem under complex competitive electricity market.
出处 《电力系统及其自动化学报》 CSCD 北大核心 2006年第6期1-5,共5页 Proceedings of the CSU-EPSA
基金 国家重点基础研究发展计划专项资助项目(2004CB217905)
关键词 奔德斯分解 系统缺电损失 最小最大悔则 多场景 输电网规划 Benders decomposition load curtailment cost min-max regret criterion multi-scenario transmission expansion planning
  • 相关文献

参考文献8

二级参考文献49

  • 1杨宁,文福拴.基于机会约束规划的输电系统规划方法[J].电力系统自动化,2004,28(14):23-27. 被引量:83
  • 2David A K, Wen F S. Transmission Planning and Investment Under Competitive Electricity Market Environment. In:Proceedings of IEEE Power Engineering Society Summer Meeting. Vancouver (Canada): 2001. 1725-1730
  • 3Merrill H M, Wood A J. Risk and Uncertainty in Power System Planning. Electric Power &Energy Systems, 1991, 13(2): 81-90
  • 4Yehia M, Chedid R, Ilic M, et al. A Global Planning Methodology for Uncertain Environments: Application to the Lebanese Power System. IEEE Trans on Power Systems, 1995,10(1): 332-338
  • 5Saraiva J T, Miranda V, Pinto L M V G. Impact on Some Planning Decisions from a Fuzzy Modeling. IEEE Trans on Power Systems, 1994, 9(2): 819-825
  • 6Madan S, Bollinger K E. Applications of Artificial Intelligence in Power Systems. Electric Power Systems Research, 1997,41(2): 117-131
  • 7Crousillat E O, Dorifner P, Alvarado P, et al. Conflicting Objectives and Risk in Power System Planning. IEEE Trans on Power Systems, 1993, 8(3): 887-893
  • 8Charnes A, Cooper W W. Chance Constrained Programming.Management Science, 1959, 6(1): 73-79
  • 9Rudnick H. Generation and Transmission in Developing Countries: Planning in a Deregulated Environment in Developing Countries: Bolivia, Chile and Peru. IEEE Power Engineering Review, 1996, 16(7): 18-22
  • 10王锡凡(WangXifan).电力系统优化规划(TheOptimalPlanningofPowerSystems),Hydraulic and Power Publishing Company)[M].北京:水利电力出版社(Beijing,1990..