施工过程对主次框架半刚性连接巨型框架受力性能影响 被引量:1

Research on Behaviors of Mage-frame Structures Considering Semi-rigid Under Three Construction Project
在线阅读 下载PDF
导出
摘要 由钢筋混凝土主框架与钢次框架组成的混合巨型框架有三种施工方案。为了探讨不同方案下巨型框架的受力性能,以4跨24层巨型框架结构为例,采用有限元软件MIDAS,考虑次框架梁柱与主框架梁柱为半刚性螺栓连接的影响,对比分析了其梁柱弯矩与主框架柱节点的位移。结果表明,三种施工方案下均需考虑施工过程带来的不利影响,且不同施工方案下相应的部位需加强配筋。 Mage-frame structure is composed of main and hypo-frame, which has good behaviors, and can be built by different ways according to construction schedule. Based on semi-rigid connection joints between main frame beam-colunm and hypoframe beam-column, the results of a 24-story mnge-frame structure with 4 span were calculated by the universal finite element method of MIDAS, and the moments and medal column joints displacements were compared between non-considering construction process and three kinds construction order. The influence of construction order on behaviors of made-frame structures considering semi-rigid connection is discussed, and suggestions are put forward in engineering practice.
出处 《建筑结构》 CSCD 北大核心 2006年第12期13-15,共3页 Building Structure
关键词 混凝土 巨型框架 钢框架 半刚性 施工顺序 受力性能 conerete mnge-frame structures steel frame semi-rigid construction order behaviors
  • 相关文献

参考文献7

二级参考文献39

共引文献79

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部