摘要 在采用风电场与小型燃气轮机组成的互补系统发电特性参数的基础上,详细分析了互补系统发电成本的构成和各自的计算方法。采用新疆达坂城风电场的风速数据,基于互补系统的发电特性参数和风电场与燃气轮机电站的发电成本构成,应用改进过的等额支付折算法,在当前的技术条件和价格下,计算了风电场子系统和燃气轮机电站子系统各自的折旧成本、燃料成本和运行维护成本,得到了整滚发电系统发电成本的计算方法,为在新疆地区实现这种互补发电系统提供经济分析基础。 this paper represents eost of electricity analysis of a novd hybrid power system composing a largescale wind farm and several gas turbine power plants in Xinjiang region,China.In terms of operation strategies of small gas turbine plants ,total. delivered dectricity and consumption natural gas of hybrid power system were firstly calculated with the real - time measured wind speed in Dabancheng wind farm, Xinjiang. The total capital invested of wind farm and gas turbine power plants were analyzed under current technology and price conditions. Aceording to the cost of depreciation,fuel and maintenance of each subeystem,the cost of dectficity of hybrid power system was calculated. The feasibility and economic benefits of hybrid power system used in Xinjiang region were discussed subsequently.
出处 《燃气轮机技术》 2006年第4期1-5,共5页 Gas Turbine Technology
基金 广东省自然科学基金项目(0410980)
关键词 风力发电 燃气轮机电站 互补发电系统 发电成本 wied power gas turbine power plant hybrid power systera cast of electridty
  • 相关文献

参考文献12

  • 1P Gardner,H Snodin,A Higgins,S McGoldrick.The impacts of increased levels of wind penetration on the electricity systems of the Republic of Ireland and Northern Ireland:Final Report[ R].Garrad Hassan and Partners Limited.2003:1-39.
  • 2S.Neris,N.A.Vovos,G.B.Giannakopoulos.A variable speed wind energy conversion scheme for connection to weak ac systems[J].IEEE Trans.on Energy Cony.,1999,14(1):122-127.
  • 3O.A.Jaramillo,M.A.Borja,J.M.Huacuz.Using hydropower to complement wind energy:a hybrid system to provide firm power.Renewable Energy[ J].2004,29:1887-1909.
  • 4George C.Bakos.Feasibility study of a hybrid wind/hydro power-system for low-cost electricity production[ J ].Applied Energy,2002,72:599 -608.
  • 5Francois Giraud.Analysis of a utility-interactive wind-photovoltaic hybrid system with battery storage using neural network[D].Doctor dissertation.University of Massachusetts Lowell,1999.
  • 6Ben M.Enis,Paul Lieberman and Irving Rubin.Operation of hybrid wind-turbine compressed-air system for connection to electric grid networks and cogeneration.Wind Engineering,2003,27(6)449-459.
  • 7M.D.Mufti,R.Balasubramanian and S.C.Tripathy.Dynamic performance assessment of an isolated wind-diesel power system with superconducting magnetic energy storage unit under turbulent wind and load disturbances[J].Int.J.Energy Res.,2002,26:85-201.
  • 8R.Kottenstette,J.Cotrell hydrogen storage in wind turbine towers[ R].National Renewable Energy Laboratory,NREL/TP-500-34656,2003.
  • 9M.T.Iqbal.Modeling and contol of a wind fuel cell hybrid energy system[ J ].Renewable Energy,2003,28 (2):223-237.
  • 10包能胜,刘军峰,倪维斗.风电与燃气轮机互补发电容量配比的仿真研究[C].仿真技术在风力发电中的应用研讨会,河北:2005,9,6-8:133-143.

二级参考文献3

  • 1.建设项目经济评价方法与参数(第二版)[M].北京:中国计划出版社,1993..
  • 2电力工业基本建设预算管理制度及费用标准汇编(增订本)[S].北京:能源部电力规划设计总院,1992.
  • 3夏淞.燃气轮机电厂的技术经济分析[R].上海:上海电力设计院