摘要
重点叙述了钢质桩基式平台安装就位的控制过程,系统地整理并分析了安装中经常出现的倾斜、下沉、拒锤等现象,并提出了处理方法,以便用于生产实际。
In this paper, how to control the installation of pipe-platforms is describled. The problems u sually present in the process are systematically analyzed, such as slanting, sinking and refusing hammer . Solving methods are proposed, so that they can be used for practice.
出处
《中国海洋平台》
2006年第6期40-45,共6页
China offshore Platform
关键词
钢质桩基式
导管槊
海上安装
Pipe-platforms, Installation on the sea, Attention problems