摘要
分析了梅山铁矿选矿降磷的迫切性,根据多方案对比试验比选,确定弱磁-强磁流程作为选矿厂降磷改造流程。
On the basis of results from analysis of the urgency to reduce the phospho rus content in run of mine and from multivariant comparative tests, the LIMS HIMS scheme was selected as dephosphorization process for the concentrator modernization project of Meishan iron mine. The effectiveness gained in production after process flow modification was introduced.
出处
《冶金矿山设计与建设》
1996年第6期37-40,共4页
Metal Mine Design & Construction
关键词
铁矿石
降磷
磁力选矿
选矿
铁矿
LIMS HIMS process Iron ore Phosphororeducing