摘要
针对含水砂层采用冻结法维护坑壁而提出的设计方案,其理论计算公式在工程实例中得到验证。
In accordance with the freezing method to support the pit wall in water-sandy Layer, the paper proposes a design pkn. Its thoretical calculation formula is consistent with its paractical engineering results.