详细介绍了沙角C电厂3台660MW机组石灰石-石膏湿法烟气脱硫装置制浆和输浆系统的设计情况,包括系统流程、主要设备参数、联锁保护等内容,同时对系统运行中出现的问题进行了分析,并提出解决问题的建议。
This paper detailedly describes the design of the slurry preparing and transporting systems in wet limestone-gypsum flue gas desulfurization (FGD) system for three 660 MW units in Shajiao C Power Station, including the system flow, main equipment parameters, interlock and protection of the systems. Problems in operation of the system are analyzed with solutions to them presented.
出处
《广东电力》
2006年第9期52-54,69,共4页
Guangdong Electric Power
关键词
发电厂
烟气脱硫
石灰石-石膏法
制浆系统
输装系统
power plant
flue gas desulfurization (FGD)
slurry transporting system limestone-gypsum wet FGD process