摘要
通过对锦州20—2 MUQ导管架安装工程中调平作业的叙述,介绍了导管架就位中调平技术的要点。
The paper presents the main techniques of leveling operation in the jacket positioning, through description of leveling in JZ 20-2 MUQ jacket installation engineering.
出处
《中国海上油气(工程)》
1996年第5期10-11,共2页
China Offshore Oil and Gas