4D CAD技术在施工管理中的应用研究 被引量:3

Application of 4D CAD in construction management
在线阅读 下载PDF
导出
摘要 4D CAD技术属于计算机技术在工程施工领域应用的一项新技术,本文作者通过论述4D CAD技术的发展,分析了4DCAD技术在施工管理中的优势。通过对比分析常见4D CAD软件的基本功能,结合一座大型桥梁工程的施工实践,具体说明4D CAD技术的优点和应用障碍。最后,提出4D CAD技术发展的趋势和方向。 4D CAD is a progress of computer technique in construction engineering management. Through description of development and benefits of 4D CAD, several common 4D CAD systems are compared. Based on application of 4D CAD in a large bridge construction project, some advantages and barriers of 4D CAD in construction management are revealed. This paper presents several directions in developing 4D CAD systems in the end.
作者 胡文发
出处 《四川建筑科学研究》 北大核心 2006年第4期166-170,共5页 Sichuan Building Science
关键词 4D CAD 施工管理 进度 计算机应用 4 D CAD construction management schedule computer application
  • 相关文献

参考文献7

  • 1Construction Industry Institute.3D Link[M].Research Summery,1995.106.
  • 2Heesom D,Mahdjoubi L.Trends of 4D CAD applications for construction planning[J].Construction Management and Economics,2004,22(2):171-182.
  • 3Jaafari A,Manivong K K,Chaaya M.VIRCON:Interactive system for teaching construction management[J].Journal of Construction Engineering and Management,ASCE,2001,127 (1):66-75.
  • 4Kamat V R,Martinez J C.Dynamic three-dimensional visualization of fluid construction materials[J].Journal of Computing in Civil Engineering,ASCE,2004,18 (3):237-247.
  • 5Koo B,Fischer M.Feasibility study of 4D CAD in commercial construction[J].Journal of Construction Engineering and Management,ASCE,2000,126 (4):251-260.
  • 6McKinney K,Fischer M.Generating,evaluating and visualizing construction schedules with CAD tools[J].Automation in Construction,1998,7 (6):433-447.
  • 7Zhang J P,Chau K W,Anson M.4D dynamic management for construction planning and resource utilization[J].Automation in Construction,2004,13 (5):575-589.

同被引文献12

  • 1张建平,韩冰,李久林,卢伟.建筑施工现场的4D可视化管理[J].施工技术,2006,35(10):36-38. 被引量:32
  • 2Hu Z Z,Zhang J P,Lu M,et al. Simulation and optimization of prefabricated steel-structure installation [C]//Proceedings of 1st International Construction Specialty Conference. Calgary, Canada, 2006.
  • 3Koo B,Fischer M. Feasibility study of 4D CAD in commercial construction[J].Construction Engineering and Management, 2000,126(4):251-260.
  • 4Mckineey K,Kim J,Fisher M,et al. Interactive. 4D-CAD [C]// Proceedings of the Third Congress. Anaheim, California, USA, 1996.
  • 5Kam C ,Fischer M, Hanninen R,et al. The product model and fourth dimension project[J]. ITcon, 2003, ( 8 ): 137-166.
  • 6欧特克软件中国有限公司构建开发组.Autodesk Revit Structure 2012应用宝典[M].同济大学出版社,2012.
  • 7欧特克软件中国有限公司构建开发组.Autodesk Revit Mep2012应用宝典[M].同济大学出版社,2012.
  • 8欧特克软件中国有限公司构建开发组.Autodesk Revit 2013族达人速成[M].同济大学出版社,2013.
  • 9张建平,胡振中.基于4D技术的施工期建筑结构安全分析研究[J].工程力学,2008,25(A02):204-212. 被引量:25
  • 10胡振中,张建平,周毅,张永利.青岛海湾大桥4D施工管理系统的研究和应用[J].施工技术,2008,37(12):84-87. 被引量:9

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部