期刊文献+

杭州湾大桥海上非通航孔桥方案探析 被引量:4

Analysis of type alternatives for in-sea-area non-navigable bridges of Hangzhou Bay Bridge
在线阅读 下载PDF
导出
摘要 中国的桥梁建设正从江河大桥阶段迈向跨海大桥阶段,因此,有必要了解跨海大桥的设计施工特点。本文作者通过对杭州湾大桥海上非通航孔桥的上部结构、桥墩、承台和基础的不同替代方案的分析比较,探讨了跨海大桥的方案选择过程,有助于提高人们对跨海大桥设计与施工的认识。 In Chinese bridge field, a change to an over-sea bridge stage from an over-river bridge stage is happening. It is needed to know the features in design and construction about bridges over sea. Proposed alternative construction schemes and structural types for the superstructure, piers, support platform and foundation of in-sea-area non-navigable bridges of Hangzhou Bay Bridge are compared and analyzed. The decision and selection of practical schemes is helpful to bridge engineers in understanding design and construction of bridges over sea.
出处 《四川建筑科学研究》 北大核心 2006年第4期162-165,共4页 Sichuan Building Science
关键词 跨海大桥 方案比较 设计方案 施工方案 bridge over sea alternative comparison design scheme construction scheme
  • 相关文献

参考文献8

二级参考文献5

  • 1JTJ254—98.港口工程桩基规范[S].[S].,..
  • 2JTGB01—2003.公路工程技术标准[S].[S].,..
  • 3JTGD60—2004.公路桥涵设计通用规范[S].[S].,..
  • 4秦顺全 周璞 邵长宇.沿海大型桥梁工程浮吊架梁方案研究[A]..21世纪国际桥梁技术的发展与展望技术论坛论文集[C].武汉,2003..
  • 5JTJ 261—97,港口工程预应力混凝土大直径管桩设计与施工规程[S].

共引文献952

同被引文献14

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部