期刊文献+

注浆胶结矿柱充填工艺在河西金矿的研究 被引量:7

Study on The Clot of In Jection
在线阅读 下载PDF
导出
摘要 在深入研究的基础上,本文主要对注浆胶结矿柱充填工艺与人工挖边槽胶结充填工艺在上向水平采矿法矿山中的实践应用作了系统的分析与研究,通过对充填质量、充填效率、充填劳动强度等方面的比较论证,得出了注浆胶结矿柱充填工艺具有施工方便、充填效率高、充填质量好、采场回采周期短、贫损两率指标低等一系列优点,从而确定了注浆胶结矿柱充填工艺对上向水平采矿法的矿山而言,是一种优势明显、切实可行的充填工艺。 Based on the penetrate into study, the paper systematically analyzed and summarized the application on the cemented stowing of digging groove and clot of injection in the horizontal sub - level mining. According to compare proof by sufficiency ,operating efficiency , intention of labor of cemented stowing ,we draw the conclusion that cement stowing of separate wall have a series of advantage, such as facility, high efficiency , good quality ,decrease every sub-level mining period and poverty rate etc. There by it is verified that cemented stowing of separate wall is efficacious in the mine that mining method is horizontal sub -level mining.
机构地区 河西金矿
出处 《黄金科学技术》 2006年第3期23-25,共3页 Gold Science and Technology
关键词 注浆 边槽 胶结体 水平分层 clot of injection groove on the side cemented stowing horizontal sub - level
  • 相关文献

同被引文献43

引证文献7

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部