摘要 为研究现浇筒桩和土工格栅加筋碎石垫层组成的复合地基加固软弱路基的作用机理及效果,介绍了某高速公路桥头筒桩处理中进行的地表沉降、分层沉降、深层土体位移、孔隙水压力、桩土应力等项目的现场测试成果。结果发现:该处理方法具有经济合理,承载力高,沉降小等特点,为解决软土“桥头跳车”提供了一种经济、有效的手段;土工格栅可以很好地调节荷载分布,使荷载更多的向桩身集中;超静孔压不大,且有规律性,不影响沉降稳定性;地基侧向变形小,变形速率在时间和深度上都呈递减趋势。 To study the performance and feasibility of tubular piles with geogrid reinforced macadam cushion, field test results, including settlement, lateral movement, pore water pressure, and pile-soil stress, are presented. The study indicates that the piles may improve the bearing capacity and meet engineering requirement on settlement with low cost, providing an economical and effective solution to the difficult problem of "bump at bridge-head" with sofl foundations. The geogrid can adjust the load distribution, thus causing the pile to carry more load and the foundation becoming more stable. Since the excess pore pressure is small, it has no influence on the stability of the foundation. Besides, the horizontal ground displacement is also small, thus the deformation rate decreases with time and depth.
机构地区 浙江大学
出处 《土木工程学报》 EI CSCD 北大核心 2006年第8期102-106,共5页 China Civil Engineering Journal
关键词 筒桩 复合地基 桩顶盖板 土工格栅 现场试验 tubular pile composite ground pile cap decking geogrid in-situ test
  • 相关文献

参考文献7

二级参考文献23

  • 1龚晓南.复合地基引论[M].杭州:浙江大学出版社,1991..
  • 2叶书麟.地基处理实例应用手册[M].北京:中国建筑工业出版社,1999..
  • 3刘汉龙 马晓辉 郝小员 等.振动沉模大直径现浇管桩技术在南京大厂经-路软基加固中应用科学研究报告[R].南京:河海大学,2001..
  • 4.TB 10035-2002,铁路特殊路基设计规范[S].北京: 中国铁道出版社,2002..
  • 5.JTJ 017-96,公路软土地基路堤设计与施工技术规范[S].北京:人民交通出版社,1997..
  • 6[1]Lin K Q, Wong I H. Use of deep cement mixing to reduce settlements at bridge approaches[J]. Journal of Geotechnical and Geoenviromental Engineering, 1999, 125(4): 309~320
  • 7[2]BelI A L, Jenner C, Maddison J D, et al. Embankment support using geogrids with vibro concrete columns[A]. In: Karunaratne G P, Chew S H, Wong K S ed. Proc. of 5th Int. Conf. on Geotextiles, Geomembrances and Related Products[C]. Singapore: [s. n.], 1994, 1: 335~338
  • 8[3]Broms B B, Wong I H. Embankment piles[A]. In: Nanyang Technological Institute ed. Proc. of 3rd Int. Geotech. Seminar--Soil Improvement Methods[C]. Singapore: [s. n.], 1985, 167~ 178
  • 9[4]Finborud B. Embankment settlement and improvement at the North Luzon Expressway, Philippines[A]. In: Raymond G P, Giroud J P ed.Proc. of 8th Southeast Asian Geotech. Conf.[C]. Malaysia: [s. n.],1985, 2:9~15
  • 10[5]Holtz R D, Massarsch K R. Geotexile and relief piles for deep foundation improvement embankment near Goterorg, Sweden[A]. In:International Society of Soil Mechanics and Foundations Engineering ed. Proc. of Geosynthetics Case Histories[C]. Richmond: Bi Tech Publisher, 1993, 168~169