摘要
根据葛洲坝电站运行情况和相关试验结果,本文分析了三峡电站建成后不同时期运行情况,发现后期将出现严重的泥沙损坏,应引起重视。
According to the operation of Gezhouba hydropower station and experimental results, this paper analyses the loperation of the Three Gorges hydropower station in different periods after its construction, and finds that more severe abrasion problem will arise in the late period ) to which great attention should be paid.
出处
《水力发电学报》
CSCD
北大核心
1996年第3期55-62,共8页
Journal of Hydroelectric Engineering
关键词
磨损
气蚀
水电站
水轮机
设计
参数
泥沙
Three Gorges hydropower station Gezhouba hydropower station Abrasion Cavitation erosion