期刊文献+

长江口与杭州湾的泥沙与河床演变对上海港及其通海航道建设的影响 被引量:6

THE CONSTRUCTION OF THE SHANGHAI PORT AND ITSSEA-ENTERING CHANNEL, INFLUENCED BY THESEDIMENTS AND THE FLUVIAL PROCESSES ATTHE CHANGJIANG RIVER ESTUARY ANDTHE HANGZHOU WAN
在线阅读 下载PDF
导出
摘要 在长江口与杭州湾泥沙和河床演变研究的基础上,对上海港的选址与建设及上海港通海航道的治理与利用,提出了新的设想。 The Changjiang Estuary in an estuary characterized by immense runoff and strong tide. Its average discharge is 29 400m*/s, in time of flood-tide, it can be as great as about 5.3X 109m3. The average tidal range at the river mouth is 2.66m. The amount of sediment is 4.605X 108m3/a. The dynamic interaction of these two strong forces leads to from the braided pattern in the Changjiang Estuary. It is divied into the South and the North Branches by the Chongm-ing Island. The South branch is likewise subdivided into two waterways, the South Waterway and the North Waterway by the Changxing and the Hengsha Island, and furthermore the South Channel and the North Channel by the Jiuduansha sandbars. Now we regard the braided channels as the North Waterway and the North and the South Channel. At their estuaries, there exist the mouth bars and the natural water depth of them are limited to about ?5.8m of the base level of the Wuson (all those following are of this base level). At the present, the North Channel is sea-entering channel of the Shanghai port and Harbours of the Changjiang Delta. The North Channel dredge to ?7m, material dredging from the channel amounts to 1.8X107m*/a. A 10 000 ton carrier may pass throuth this channel with the tide. The fluvial processes of the North and the South waterway appear primarily to be thriving and degenerating alternatively. A study of historical records and topographic maps of the Changjiang Estuary reveals that on an average the waterway changed its position with a frequence of about once in twenty years. The Hangzhou Wan is a typical funnel-shaped estuary with strong tide from the mouth to the apex. The reduction of width is 80km, while the increase of tidal ramge is twice as much. The average tidal range is 5.45m, the maximum tidal range is 8.93 m. The annual average discharge of Qiantangjiang is only 921 ms/s, while the average discharge of flood tide may reach 190 000m3/s. The formation of a funnelshaped estuary of a deltaic estuary is due to the less quantity of sediment of the Hangzhou Wan with an average amount of merely 5.328 X 107 t/a, of which clay sediment takes up 76.2% of the total. The Hangzhou Wan is divided into the South and the North Branches by the Qiqu Archiplage. The average natural water depth is about ?.11 m. The less quantity of sediment and very fine particle are not liable to settle down and so the waterways are quite stable. The change of channel is rather slow. At the present, these twowaterways are not developed as yet. The Shanghai Port, the biggest port of China, lias at present, not enough passing capacity. Inorder to solve this difficulty, some new ports must be built. According to sedimentation, fluvial processes and water depth of sea-entering channel and port-sites, the author suggests the best port-sites at Jinshzui and Qiyikou which are selected from the Hangzhou Bay and the Ch-angjiang Estuary. For the former, the berth will be limited from 35 000 to 50 000 ton-class and for the latter from 10 000 to 20 000 ton-class. The passing capacity of the main channel at the Changjiang Estuary is affected by the dredging difficulty. To solve this problem, in order to make full use of the main entering channel, an auxilliary channel of South Branch of the Changjiang Estuary and a sea-entering channel at the Hangzhou Wan must be opened up at the same time in the nest decade.
作者 林承坤
出处 《地理学报》 EI CSSCI CSCD 北大核心 1990年第1期78-89,共12页 Acta Geographica Sinica
基金 国家自然科学基金资助项目
关键词 港口 泥沙 河床 演变 海港 航道 Sediment Fluvial process Water depth Tidal range Mouth bar Port Port-site Sea-entering channel
  • 相关文献

参考文献10

  • 1林承坤,1988年
  • 2黄胜,泥沙研究,1986年,42期,5页
  • 3曹兰生,中国港口参考资料,1986年,42期,5页
  • 4肖钟熙,中国港口参考资料,1986年,42期,33页
  • 5朱国贤,中国港口参考资料,1986年,42期,45页
  • 6蔡源佑,水运工程,1984年,4期,11页
  • 7王志豪,全国海岸带和海涂资源综合调可与海岸工程学术会议论文集.上,1982年
  • 8黄胜,河流泥沙国际学术讨论会论文集,1980年
  • 9刘宅仁,海港工程设计和施工,1980年
  • 10钱宁,1964年

同被引文献50

引证文献6

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部