期刊文献+

大跨度斜拉桥损伤识别的三步法 被引量:8

THREE-STEP METHOD FOR DAMAGE DETECTION OF LONG SPAN CABLE-STAYED BRIDGES
在线阅读 下载PDF
导出
摘要 大跨度斜拉桥是交通线上的重要结构,对其健康状态进行监测具有重要价值。以位于广东新会的崖门桥(双塔刚构体系预应力单索面混凝土斜拉桥)为工程背景,探讨了结构动力损伤识别的基本步骤以及利用结构动力损伤识别三步法对大型工程结构进行损伤识别的有效性。结果表明结构动力损伤识别三步法对大跨度斜拉桥的损伤识别具有较好的适用性,适合在大跨度斜拉桥的健康监测中应用。 Cable-stayed bridge (CSB) is an important structure on traffic lines. Monitoring the bridge health is very necessary. In this paper basic steps of structural dynamic damage detection are discussed and a three-step method for structure damage diagnosis (TSMSDD) is proposed. The method is verified using the Yamen cable-stayed bridge of Xinhui city in Guangdong Province. The result shows that the proposed TSMSDD is effective for damage detection of long span cable-stayed bridge.
出处 《工程力学》 EI CSCD 北大核心 2006年第8期53-56,41,共5页 Engineering Mechanics
基金 国家自然科学基金(50278047) 广东省自然科学基金(000387)联合资助
关键词 桥梁工程 斜拉桥 健康监测 损伤识别 三步法 bridge engineering cable-stayed bridge health monitoring damage detection three-step method
  • 相关文献

参考文献9

  • 1Farrar C R,Cornwell P J,Doebling S W.Structural health monitoring studies of the Alamosa Canyon and I-40bridge[R].Los Alamos,NM,USA:Los Alamos National Laboratory,2000.
  • 2Brincker R,Andersen P,Cantieni R.Identification and level 1 damage detection of the Z24 Highway Bridge by frequency domain decomposition[J].Experimental Techniques,SEM,2001,25(6):51~57.
  • 3Doebling S W,Farrar C R,Prime M B,Shevitz D W.Damage identification and health monitoring of structural and mechanical systems from changes in their vibration characteristics:A Literature Review[R].Los Alamos,NM,USA:Los Alamos National Laboratory,1996.
  • 4Sohn H,Farrar C R,Hemez F M.A review of structural health monitoring literature:1996-2001[R].Los Alamos,NM,USA:Los Alamos National Laboratory,2003.
  • 5Xie Jun,Han Da-jian.A three-step method for structure damage diagnosis based on fem and vibration data[A].EPMESC Ⅸ-the 9th International Conference on Enhancement and Promotion of Computational Methods in Engineering and Science[C],Macao,China:A A Balkema Publishers,2003.883~887.
  • 6Alvin K F.Finite element model update via bayesian estimation and minimization of dynamic residuals[J].AIAA Journal,1997,35(5):879~886.
  • 7Farhat C,Hemez F M.Updating finite element dynamic models using an element-by-element sensitivity methodology[J].AIAA Journal,1993,31(9):1702~1711.
  • 8胡利平.崖门大桥主桥斜拉桥-工程检测试验报告[R].广东省交通建设工程质量检测中心,2002
  • 9杨咏昕,陈艾荣,项海帆.桥梁结构动力特性分析中节点刚性区问题的处理[J].土木工程学报,2001,34(1):14-18. 被引量:44

二级参考文献8

  • 1同济大学土木工程防灾国家重点实验室,南京长江二桥桥塔自立状态气动弹性模型风洞试验研究,1999年
  • 2同济大学理论力学教研室,理论力学,1990年
  • 3石洞,桥梁结构电算,1985年
  • 4崔俊芝(译),有限元方法分析,1979年
  • 5姜礼尚,有限元方法及其理论基础,1979年
  • 6洪锦如,桥梁结构计算力学,1998年
  • 7《公路桥梁抗风设计指南》编写组,公路桥梁抗风设计指南,1996年
  • 8李国豪,桥梁结构稳定与振动(修订版),1996年

共引文献44

同被引文献58

引证文献8

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部