摘要
结合邯郸钢铁总厂1260m3高炉上料系统,介绍了高炉槽下上料过程可编程控制系统的控制组态,控制要求及称量控制。经实践表明,采用该系统及控制算法,具有较高的控制精度,完全可以满足高炉槽下上料的工艺要求。
This paper discusses the PLC configuration,control process and weight control of the control system in the stock house of the blast furnace in Handan iron and steel factory,the practice operation shows that the system can per form a high accuracy of control and meet the needs of control process.
出处
《基础自动化》
CSCD
1996年第3期22-25,共4页
Basic Automation
关键词
PLC
高炉
装料系统
炼钢
PLC, automation process management, configuration, decrease control