成碧可控串补工程阻尼控制试验分析 被引量:5

Test and Analysis on Low Frequency Oscillation Damping Control in TCSC Project for 220 kV Transmission Line from Cheng County to Bikou in Gansu Province
在线阅读 下载PDF
导出
摘要 甘肃成县-碧口线220kV可控串补(thyristorcontrolledseriescompensator,TCSC)工程是我国第一个可控串补国产化示范工程,甘肃陇南地区电网为典型长线弱送端系统,系统稍有扰动或者增加机组出力,成碧线就会出现低频振荡。介绍了成碧系统采用电力系统稳定器(powersystemstabilizer,PSS)以及TCSC阻尼低频振荡的控制方案,系统试验结果表明,成碧线TCSC可有效抑制低频振荡,且TCSC和PSS之间可以实现协调配合。 The thyristor controlled series compensation (TCSC) project for 220kV transmission line from Cheng County to Bikou (abbr. Cheng-Bi transmission line) in Gansu Province is the first domestic-manufactured demonstration project of TCSC in China. The Longnan regional power network in Gansu province is a typical long distance power transmission system with weak sending end, as soon as this system has a little bit of disturbance or the active power output of generating units increases, low frequency oscillation will occur. As the first on-site test to repress low frequency power oscillation by TCSC in the world, the authors propose a control scheme to damp the low frequency oscillation occurred in Cheng-Bi transmission line by use of power system stabilizer (PSS) and TCSC. Results of on-site tests show that by means of TCSC the low frequency oscillation in Chen-Bi transmission line can be effectively repressed and the coordination between TCSC and PSS can be implemented.
出处 《电网技术》 EI CSCD 北大核心 2006年第16期35-39,共5页 Power System Technology
关键词 低频振荡 可控串补 阻尼 电力系统稳定器 电力系统 low frequency oscillation thyristor controlled series compensation damping power system stabilizer power system
  • 相关文献

参考文献13

二级参考文献60

共引文献462

同被引文献72

引证文献5

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部