期刊文献+

锦屏水电站辅助洞高压大流量地下涌水的预防与治理 被引量:6

Prevention and control of ground water surge with high pressure and large flow for construction of auxiliary tunnel of Jinping Hydropower Station
在线阅读 下载PDF
导出
摘要 介绍了雅砻江锦屏水电枢纽辅助洞工程从开工至2005年底所遭遇的五次高压大流量地下涌水的情况及其规律,并指出了在隧洞掘进过程中地下涌水的前兆及其治理经验。 For construction of the auxiliary tunnel of Jinping Hydropower Station, five water surges with high pressure and large flow are described, and then their occurrence laws are introduced as well. Furthermore, the portent of possible surge from ground water and the experience of its control during the tunneling concerned are put forward herein.
出处 《水利水电技术》 CSCD 北大核心 2006年第8期9-12,19,共5页 Water Resources and Hydropower Engineering
关键词 高压大流量地下涌水 预防 治理 辅助洞 锦屏水电站 ground water surge with high pressure and large flow prevention control auxiliary tunnel Jinping Hydropower Station