期刊文献+

高坝洲升船机计算机监控系统网络分系统调试 被引量:8

Debugging of sub-system in computer monitoring system network for ship lift of Gaobazhou Water Control Project
在线阅读 下载PDF
导出
摘要 高坝洲升船机计算机监控系统工业以太网由A、B双冗余环形光纤网络组成,具有较高的通信可靠性和灵活性。文中介绍了通信网络的组成和网络分系统调试的前提条件、内容、方法、结果及最终结论,可供其他采用双冗余环形光纤快速网络工程的计算机监控系统通信网络分系统调试作参考。 Industrial Ethernet network of the computer monitoring and control system for ship lift of Gaobazhou Water Control Project is made up of A and B double redundancy ring optical fiber networks with better reliability and flexibility. The structure of the network and the preconditions, contents, means, results and final conclusions of the network subsystem debugging are introduced herein; which can be taken as a reference for the debugging of the other similar systems.
出处 《水利水电技术》 CSCD 北大核心 2006年第8期119-120,125,共3页 Water Resources and Hydropower Engineering
关键词 网络调试 计算机监控系统 升船机 高坝洲水利枢纽 network debugging computer monitoring system ship lift Gaobazhou Water Control Project
  • 相关文献

参考文献3

  • 1西安航天自动化股份有限公司,四川夹江水工机械厂.湖北清江高坝洲升船机现场总体联调实施方案[R].2004.
  • 2Richard Hirschmann GmbH & Co.RS2-…/… Management Manual[Z].2000.
  • 3Richard Hirschmann GmbH & Co.Hivision 6.2 Manual Hirschmann Network Management[Z].2003.

同被引文献27

引证文献8

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部