摘要
穿越水域的道路隧道的施工方法主要为盾构法、沉管法和围堰明挖法等,作者主要针对不同的环境条件和隧道的结构型式等对隧道的总体布置原则、内容和要求等作了介绍。
There are several methods such as shield and immersed tube tunneling as weU as cut and cover with cofferdam used for construction of road tunnel under river. This paper mainly introduces the principle, content and requirements of master plan of the tunnel under various environmental conditions.
出处
《地下空间与工程学报》
CSCD
2006年第4期528-531,546,共5页
Chinese Journal of Underground Space and Engineering
关键词
隧道总体布置
横断面
平面
纵断面
master plan of tunnel
cross section
plan
longitudinal section