以采用单管顺流式供暖系统的某建筑物供热热源改造工程为研究对象,探讨了水源热泵+调峰锅炉联合供热系统运行参数的设计基准及热水流量的约束条件。通过对供暖系统热力失调度的计算分析,说明采用设计基准选择的运行参数合理。
Taking the renovation engineering of a building heating heat source using one-pipe-series-loop system for research object, the design criteria of operational parameters of combined heat-supply system based upon water source heat pump and peak-shaving boiler and the restricted conditions of hot water flow rate are discussed. The calculation analysis on thermal misadjustment degree of the heating system shows that the operational parameters selected with the design criteria are reasonable.
出处
《煤气与热力》
2006年第8期49-52,共4页
Gas & Heat
关键词
水源热泵
调峰锅炉
联合供热系统
运行参数
water source heat pump
peak-shaving boiler
combined heat-supply system
operational parameters