摘要
双梁式整体提升法是一种新型的大型结构安装方法,主要由固定梁、活动梁、钢绞线、工作锚、工具锚、导向装置及千斤顶组成,与现在常用的安装方法相比,具有价廉、安全、高效和易推广等特点。
As a new installation method for big structures, double girder integral lift is mainly composed of fixed girder, moveable girder, work anchor, moveable anchor, jacks and guide rail. Compared with conventional methods, it is cheap, safe, high efficient and easy to be spread to use.
出处
《建筑技术》
北大核心
2006年第8期584-586,共3页
Architecture Technology
关键词
双梁
整体提升
安装方法
double girder
integral lift
installation method