摘要
结合天津港南疆南围埝(西段)的工程实例,对施工过程的控制和关键工序的控制方面做了详细论述,最后阐述了施工沉降量控制需注意的问题,以达到改进施工工艺,节约工程成本的目的。
Combined with practical engineering of Tianjin harbor south surrounding dock (west section), the author introduces its general condition, discusses the control of its construction process and key working procedure; and illustrates attentions should be noticed in construction settlement quantity control, in order to improve construction technique and to save construction cost.
出处
《山西建筑》
2006年第16期125-126,共2页
Shanxi Architecture
关键词
施工过程
施工工艺
沉降控制
construction process, construction technique, settlement control