摘要
结合1台700MW燃煤机组的快速甩负荷试验,探讨了机组快速甩负荷功能的重要性,并论述了它对主设备及控制设备各方面性能的要求。
The importance of fast cut-back capability of power units in case of load rejection is being connection with load rejection test results of a 700MW coal fired power unit. Performance requirements of equipment and of the control equipment are moreover explained. Figs 4, table 1 and ref 1.
出处
《动力工程》
EI
CSCD
北大核心
2006年第4期520-524,共5页
Power Engineering
关键词
自动控制技术
火电机组
快速甩负荷
试验
旁路
automatic control technique
fossil fired power units
fast cut-back
test
by-pass discussed in principle