该文根据南京经济技术开发区区内一些工程实践经验,介绍了预制混凝土管桩静压法的施工方法及在不同地质条件下,施工中所应注意的一些问题。
Based on some engineering practical experience in Nanjing Economical Technical Development Zone,the article introduces the construction method of static pressure process for the prefabricated concrete pipe pile,and under the different geological conditions,some problems should be paid attention under the construction.