摘要
在分析西石门铁矿现有通风系统存在的问题以及相关规程的要求的基础上,确立了矿井通风系统可靠性评价的指标体系,并采用模糊综合评价法对矿井通风系统进行可靠性评价,提出了西石门铁矿通风系统的优化改造方案,并通过部分方案实施取得了较好的通风效果。
Based on the analysis of the problems existing in the present ventilation system in Xishimen Iron Mine and the requirements of related regulations, the index system for the evaluation of the mine ventilation system reliability was established and fuzzy comprehensive evaluation method was used to assess the reliability of mine ventilation system. The optimization-transformation scheme for the ventilation system of Xishimen Iron Mine was proposed, whose partial execution has achieved good ventilation effect
出处
《金属矿山》
CAS
北大核心
2006年第7期72-76,共5页
Metal Mine
关键词
通风系统
指标体系
模糊综合评价
改造方案
Ventilation system, Index system, Fuzzy comprehensive evaluation, Transformation scheme