期刊文献+

IMPROVED ACO SCHEDULING ALGORITHM BASED ON FLEXIBLE PROCESS 被引量:3

柔性工艺路线的改进蚁群作业调度算法(英文)
在线阅读 下载PDF
导出
摘要 An improved ant colony optimization (ACO) algorithm is utilized in cell scheduling of the flexible manufaturing process for considering the instrument constraint, manufacturing cost and time. Firstly, the initial weighted directional diagram is set up. Secondly, the algorithm based on the dynamic pheromone updating ensures the quick convergence and the optimal solution, thus improving the feasibility and the stability of the schedule system. Aiming at reducing collaboration with external partners, decreasing the total cost and balancing the production process, the algorithm is efficient in supporting the management process of the manufacturing cell and in strengthening the information arrangement capabitity of the scheduling system. Finally, experimental results of the improved algorithm are compared with those of other algorithms. 在具有柔性工艺路线的制造单元作业调度问题中,结合设备的约束以及加工过程中的费用、加工时间等因素,依据具有柔性的工艺加工路线,建立初始有向图。采用基于动态信息素更新策略的改进蚁群优化算法,在保证优化目标的基础上,迅速收敛并得到最优解,从而提高调度系统的可行性,增强系统稳定性。该方法以减少外协,均衡生产,降低总生产费用为目标,有效地支持了分布式制造单元的管理过程,增强了单元系统信息分布处理能力。最后通过算例,对计算结果进行了分析和讨论。
出处 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI 2006年第2期154-160,共7页 南京航空航天大学学报(英文版)
基金 国家"八六三"高技术研究发展计划(863-511-910-043-03)资助项目 江苏省自然科学基金(BK97061)资助项目~~
关键词 manufacturing cell cell scheduling ACO PHEROMONE 制造单元 作业调度 蚁群优化 信息索
  • 相关文献

参考文献1

  • 1K.L. Mak,X.X. Wang. Production Scheduling and Cell Formation for Virtual Cellular Manufacturing Systems[J] 2002,International Journal of Advanced Manufacturing Technology(2):144~152

同被引文献39

  • 1陈果.3D Measurement and Stereo Reconstruction for Aeroengine Interior Damage[J].Chinese Journal of Aeronautics,2004,17(3):149-151. 被引量:5
  • 2崔志华,高慧敏,曾建潮.一种求解连铸生产调度问题的非线性遗传算法[J].计算机工程与应用,2004,40(35):205-207. 被引量:3
  • 3郑忠,何腊梅,高小强.炼钢生产物流系统仿真的细胞自动机模型[J].钢铁,2004,39(11):75-78. 被引量:17
  • 4常俊林,郭西进,马小平.并行机成组调度问题的启发式算法[J].计算机工程与应用,2007,43(4):234-236. 被引量:3
  • 5Neron E,Baptiste P,Gupta J N D.Solving hybrid flow shop problem using energetic reasoning and global operations[J].Omega,2001,29(6):501-511.
  • 6Tang L,Liu J,Rong A,et al.A review of planning and scheduling systems and methods for integrated steel production [J].European Journal of Operational Research, 2001,133( 1 ) : 1-20.
  • 7常春光 胡琨元 汪定伟 等.钢铁生产动态调度理论研究与工程应用综述.信息与控制,2001,133(1):1-20.
  • 8Tang L,Liu J,Rong A,et al.A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operational Research, 2000,120(2) : 423-435.
  • 9Santos C A,Spim J A,Gareia A.Mathematieal modeling and optimization strategies(genetic algorithm and knowledge base) applied to the continuous casting of steel[J].Engineering Application of Artificial Intelligence, 2003,16(8) :511-527.
  • 10Mohanty P P.An agent-oriented approach to resolve the production planning complexities for a modem steel manufacturing system[J]. Int J Adv Manuf Technol,2004,24(3/4): 199-205.

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部