介绍了齐岳山隧道出口工区衬砌的施工工艺和方法,着重阐述施工过程(工序)控制项目和要点,原材料控制项目和主要技术指标,分析了质量通病产生的原因和控制方法。
In this article, the construction technology and method, the construction processes, the chief technical norms and the controling of building material in Qiyueshan Tunnel are introduced. The main cause and control methods of the quality fault in tunnel construction are also provided.
出处
《铁道建筑技术》
2006年第3期5-9,共5页
Railway Construction Technology
关键词
铁路隧道
衬砌
施工
railway tunnel
secondary lining
construction