摘要
通过对丰山铜矿滑坡的调查、分析、计算,结合矿山生产的实际情况,提出了三个综合治理方案,在逐个方案分析比较的基础上,确定了调整境界方案为滑坡治理的最优方案,采用此方案治理滑坡,达到了预期目的与要求,并为矿山减少亏损77.4万元。
Slope failure in Fengshan Copper Mine was investigated and analyzed, and related calculations were performed with the mine's production reality being taken into account. As a result, three1 comprehensive schemes for controlling slope slide were obtained and the optimum one was determined, ie. regulating pit limits on the basis of comparison and analysis between the schemes. After this scheme was put into action,the slope sliding was controlled and aproximate 774000 yuan (RMB) of loss reduced for the mine.