摘要 大型水电站导流洞围堰拆除爆破除了要考虑周围保护物(如进水塔、闸门等)的爆破振动安全外,还要考虑分流及冲渣效果。以小湾水电站导流洞围堰爆破拆除为例,总结分析了爆破拆除过程中面临的关键问题及相应的解决方法。 Besides the safety of protected objects nearby (for example: entrance water tower, strobe etc ), the detach stream and flush cinder effect were considered in explosive demolition of cofferdam of water conveyance tunnel on large hydropower station. This paper summarizes and analyzes the key problems and their solving means in cofferdam explosive demolition course for instance of the Xiaowan Hydropower Station.
出处 《爆破》 CSCD 2006年第2期80-84,共5页 Blasting
关键词 导流洞 围堰 爆破振动 water conveyance tunnel cofferdam explosive vibration
  • 相关文献

参考文献2

二级参考文献6

  • 1熊长汉.葛洲坝大江上游围堰拆除爆破水击波监测报告[M].长江科学院,1985..
  • 2刘美山.三峡永久船闸下游泄水箱涵出口爆破水击波测试报告[M].长江科学院,2000..
  • 3熊长汉.青岛2458工程船坞岩坎拆除爆破水击波测试报告[M].长江科学院,1992..
  • 4赵根.青岛灵山船厂船坞岩坎拆除爆破水击波测试报告[M].长江科学院,1994..
  • 5杨光旭.水下工程爆破[M].长江水利委员会,1990..
  • 6赵根.云南大朝山水电站岩埂爆破[M].长江科学院,2001..