摘要
为解决焦化污水问题,利用现有设施及场地,在原有基础上进行A/O法改造,介绍了改造的工艺流程及工艺特点,调试经过及处理效果,并指出工艺设计的不足与待改进问题。
In order to solve the problem of coking sewage, on the basis of the existing facilities and fields, the A/O process was improved. The technological process and characteristics after improvement, commissioning procedure and disposal effect were presented. Shortcomings in the process design and problems to be improved were pointed out.
出处
《冶金动力》
2006年第3期30-32,共3页
Metallurgical Power
关键词
焦化污水
改造
工艺
coking sewage
reconstruction
process