摘要
穿黄工程是南水北调中线的咽喉工程。沿线地质环境条件复杂。现状条件下,场区黄河南岸段多发滑坡、崩塌、潜蚀塌陷、地裂缝等地质灾害;黄河河床及河漫滩段存在砂土液化问题;黄河北岸清风岭段存在黄土湿馅问题。工程建设过程中存在黄土高边坡失稳问题,可能引发崩塌、滑坡等地质灾害,砂土液化、黄土湿陷、潜蚀塌陷、不均匀沉陷及地裂缝等可能使工程遭受危害。工程建设过程中需针对不同的灾害类型采取适当的预防或治理措施。
. The Yellow River-Crossing project plays a decisive role in the national key project"south-to-North Water Diversion". During construction, the unstable loess high slopes might produce geological hazards like collapses, landslides, liquefaction, loess collapses, cave-in caused by sub-erosion, uneven subsidence and land fissures, which might threaten the project. Proper measures should be taken to cope with different geological hazards.
出处
《南水北调与水利科技》
CAS
CSCD
2006年第3期30-33,共4页
South-to-North Water Transfers and Water Science & Technology
基金
南水北调中线工程总干渠河南段地质灾害危险性评估和压覆矿产资源储量核查评估项目(合同编号:南综2004-2)
关键词
南水北调中线
穿黄工程
地质灾害
防治
措施
the middle route of the South-to-North Water Transfer
the Yellow River-Crossing project
geological hazards
prevention measures