摘要
分析了深圳地铁一期工程车站环控小系统在维护保养、可靠性、能耗等方面存在的问题。提出了续建工程采用变冷媒流量(VRV)系统的建议,并对其适用性和经济技术指标进行了对比分析。
The paper analyzes the problems of the environmental control sys-tem at stations that have been in existence in the aspects of maintenance,reliability and energy consumption for the construction of the Shenzhenmetro phase 1 and thus puts forth the idea of adopting the varyingrefrigerant volume system for the extended construction and carriesout the contrasts and analyses for its adaptability and the economicand technological indices.
出处
《现代城市轨道交通》
2006年第3期33-34,共2页
Modern Urban Transit