摘要 为研究人的失误行为特点以及人因失误对生产单元的整体影响,提出了以人为中心、面向任务的生产单元人因失误对比仿真方法。以3维激光焊接生产单元为研究实例,首先,对比了人在传统生产单元和自治生产单元中的两种工作流程特点,基于有色时间Petri网分别建立了两种工作流程的任务网络模型。然后,系统地构建了工作时间、失误水平、废品率、失误损失当量等人因失误评价指标体系,提出了仿真参数和各评价指标的具体算法,并开发了人因失误动态仿真程序。最后,基于对仿真结果的统计学分析和讨论,给出了生产单元以人为中心的改进措施。实例研究表明,以人为中心、面向任务的人因失误仿真,可实现对工作者整体工作流程的分析、评价与改进,为发挥人的主动性、提高系统的可靠性和工作效率起到了重要的作用。 In order to study human error behavior and its' overall influence on production cells, a human--centered task--oriented comparative simulation approach with human error was proposed. Firstly,characteristics of conventional working process and autonomous working process of the worker in a 3D laser welding production cell were analyzed,and two task--network models were built based on timed stochastic colored Petri nets. Secondly, evaluation index system including working time, error level, defective rate, and error expense equivalents were systematically constructed. Simultaneously, concrete calculation algorithm for simulation parameters and evaluation index were worked out and a human error simulation system was developed. Finally,based on the statistics analysis and discussion of the simulation results, human error influences and human--centered improvement approaches for the production cell were studied and presented. The case study showed that human--centered task--oriented human error simulation was an effective approach to evaluate system reliability and improve human initiative,working efficiency and product quality.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2006年第5期672-680,共9页 Computer Integrated Manufacturing Systems
关键词 生产单元 人因失误 以人为中心 仿真 激光焊接 production cell human error human-- centered simulation laser welding
  • 相关文献

参考文献17

  • 1刘飞,罗振璧,张晓冬.先进制造系统[M].北京:中国科学技术出版社,2005.
  • 2LAWRENCE J,PRINZEL Ⅲ. Team-centered perspective for adaptive automation design[R]. Hampton, VA, USA: Langley Research Center, 2003.
  • 3LUCZAK H,REUTH R,SCHMITT L. Development of error-compensating UI for autonomous production cells[J]. Ergonomics,2003,46(1-3): 19-40.
  • 4AGARWAL A, SARKIS J. Evaluating functional and cellular manufacturing systems: a model and case analysis[J]. International Journal of Manufacturing Technology and Management,2001,3(6) :528-549.
  • 5TAJ S, COCHRAN D S. Simulation and production planning for manufacturing cells [ A]. Proceedings of the 1998 Winter Simulation Conference [C]. Washington, D. C., USA: ACM Press, 1998. 973- 978.
  • 6MOCK R, SCHERRER R. Human reliability analysis related issues in IT- system operation: a case study[A]. PSAM7/ESREL'04-Probabilistic safety assessment and management[C].Berlin, Germany: Springer- Verlag, 2004.650 - 655.
  • 7LICHT T,DOHMEN L,SCHMITZ P,et al. Person-centered simulation of product development processes using timed stochastic colored Petri nets[A]. Proceedings of the European Simulation and Modeling Conference[C]. Paris, France: EUROSIS-EIT Press,2004. 188-195.
  • 8NESS J W,RITZER D R, TEPE V. Metrics and methods in human performance research toward individual and small unit simulation[M]. Washington, D. C. , USA: Human System Information Analysis Center,2003.
  • 9戴立操,张力,黄曙东.复杂工业系统中人因失误根本原因分析[J].中国安全科学学报,2003,13(11):13-16. 被引量:16
  • 10侯二秀,顾力刚.人因失误的管理对策分析[J].人类工效学,2004,10(2):53-55. 被引量:6

二级参考文献12

  • 1裴文开,唐文彪,陈宝林.浅析操作失误中的人的因素[J].人类工效学,1999,5(1):55-57. 被引量:3
  • 2张力,王以群,黄曙东.人因事故纵深防御系统模型[J].南华大学学报(社会科学版),2001,2(1):31-34. 被引量:7
  • 3张力,王以群,邓志良.复杂人——机系统中的人因失误[J].中国安全科学学报,1996,6(6):35-38. 被引量:79
  • 4Noyes JM.Managing Errors[A].UKACC International Conference on CONTROL[C].New York:Institute of Electrical and Electronics Engineers,1998.578-582.
  • 5Werner WF,Hirano M,Kondo S,et al.Results and insights from level-1 Probabilistic Safety Assessments for NPPs in France,Germany,Japan,Sweden,Switzerland and the United States[J].Reliability Engineering and System Safety,1995,48(3): 165-185.
  • 6Koval DO, Floyd HL. Human element factors affecting reliability and safety[J].IEEE Transactions on Industry Applications Publications,1998,34(2):410-412.
  • 7罗伯特·希斯.危机管理[M].北京:中信出版社,2001..
  • 8Swain A D,Guttmann H E. Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Application[S]. NUREG/CR-1278, 1983
  • 9Mark Kearney, Michael Llewellyn , WANO Event Investigation Training, WANO OE Central Team, WANO-Paris Center[S], 2001
  • 10黄卫刚,张力.大亚湾核电站人因事件分析与预防对策[J].核动力工程,1998,19(1):64-67. 被引量:35

共引文献27

同被引文献33

  • 1刘飞,罗振璧,张晓冬.先进制造系统[M].北京:中国科学技术出版社,2005.
  • 2戴立操,黄曙东,张力.现代制造系统中人因失误分析[J].系统工程,2007,25(2):101-105. 被引量:10
  • 3孙林岩,崔凯,孙林辉.人因工程[M].北京:科学出版社,2011.
  • 4刘 飞,罗振壁,张晓冬.先进制造系统[M].北京:中国科学技术出版社,2005.
  • 5VINEYARD M L,MEREDITH J R.Effect of maintenance policies on FMS failures[J].International Journal of Production Research,1992,13(11):2647-2657.
  • 6SAFAEI N,BANJEVIC D,JARDINE A K S.Impact of the use-based maintenance policy on the performance of cellular manufacturing systems[J].International Journal of Production Research,2010,48(8):2233-2260.
  • 7KELLY C M,MOSIER C T,MAHMOODI F.Impact of maintenance policies on the performance of manufacturing cells[J].International Journal of Production Research,1997,35(6):767-787.
  • 8GARG A,DESHMUKH S G.Maintenance management:literature review and directions[J].Journal of Quality in Maintenance Engineering,2006,12(3):205-238.
  • 9SAVSAR M.Effects of degraded operation modes on reliability and performance of manufacturing cells[J].International Journal of Industrial and Systems Engineering,2012,11 (1):189-204.
  • 10SAFAEI N,BANJEVIC D,JARDINE A K S.Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem[J].International Journal of Production Research,2012,50(1):63-80.

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部