期刊文献+

中央空调轮停技术方案比较 被引量:6

Comparison on technical schemes of duty-cycling control in central air-conditioning system
在线阅读 下载PDF
导出
摘要 空调用电的急剧增加是造成电网负荷峰谷差不断拉大的主要原因。介绍中央空调周期性暂停技术的研究思路。结合实际情况,从系统控制方案、通信方案等方面对通信规约控制、干接点控制和智能减载控制3种集中空调轮停技术方案进行比较,优选实施方案。在夏季高温期来临之前做好电力负荷的削峰填谷工作,有利于提高能源利用效率。 The rapid addition of air-conditioning power consumption is the basic reason of the load peak and off-peak difference in network. This paper introduces the research idea on duty-cycling control technique of central air-conditioning system. According to actual situation,communication protocol control,dry contact control and intelligence control axe compared from the aspects of system control and communication method. And the best project is chosen. It will benefit to peak load shifting of power load and improve the energy resources efficiency during summer with heavy demand in electric power.
出处 《电力需求侧管理》 北大核心 2006年第3期31-32,共2页 Power Demand Side Management
关键词 中央空调 轮停 通信规约控制 干接点控制 智能减载控制 central air-conditioning duty-cycling control communication protocol control dry contact control intelligence load shedding control
  • 相关文献

参考文献2

二级参考文献4

  • 1朱成章.台湾的电力需求侧管理[J].现代节能,1996,12(4):23-25. 被引量:3
  • 2台湾电力公司.八十九年负载管理年报[Z].,2001..
  • 3杨宏泽 陈世杰 蔡宛妮 等.中央空调周期性暂停用电与遥控降载措施绩效评估与目标值订定模式研究[Z].,2000..
  • 4杨炎如.2001-2002年度中国制冷空调工业行业发展概况[Z].,2003..

共引文献13

同被引文献137

引证文献6

二级引证文献183

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部