摘要 2005年随着灵宝背靠背直流输电系统的投入运行,我国在运的高压直流输电系统已达到6条,总输送容量12360MW。2005年总输送电量约612.11亿kW·h,直流输电已经成为跨区电网间电力交换的主要方式。主要对三峡外送葛洲坝—南桥、龙泉—政平、江陵—鹅城超高压直流输电系统2005年的运行情况进行了分析,列举了2005年直流系统中出现的较大设备事故和可靠性指标数据以及一些反事故措施,并提出有关建议。论述直流输电系统运行情况,供电力系统设计和运行维护参考。 In 2005 Ling-Bao Back-to-back HVDC transmission system have put into service, at present in China there are total six HVDC transmission projects in service, and the total transmission capacity is 12.36 GW. In year 2005 delivered energy is 61.211TW. h, so HVDC transmission has become the main power exchange means among grids. In this paper the operation of the Three Gorges output HVDC transmission system (C, ezhouba-Nanqiao, Longquan-Zhengping, Jiangling-Echeng) in 2005 is described. Some important equipment damages, reliability datas and corresponding countermeasures are analyzed. At last some suggestions are proposed. The evaluate will be referred by other power system designs ,operation and maintence.
出处 《中国电力》 CSCD 北大核心 2006年第5期12-17,共6页 Electric Power
关键词 三峡 直流 运行分析 Three Gorges HVDC operation analysis
  • 相关文献

参考文献6

  • 1易桂喜.时间-震级可预测模式及其应用研究进展[J].国际地震动态,1998(11):8-13. 被引量:4
  • 2闻学泽.时间相依的活动断裂分段地震危险性评估及其问题[J].科学通报,1998,43(14):1457-1466. 被引量:45
  • 3国家地震局震害防御司.中国历史强震目录[M]地震出版社,1995.
  • 4闻学泽.活动断裂地震潜势的定量评估[M]地震出版社,1995.
  • 5B. C. Papazachos,Ch. A. Papaioannou. Long-term earthquake prediction in the Aegean area based on a time and magnitude predictable model[J] 1993,Pure and Applied Geophysics PAGEOPH(4):593~612
  • 6B. C. Papazachos. A time- and magnitude-predictable model for generation of shallow earthquakes in the Aegean area[J] 1992,Pure and Applied Geophysics PAGEOPH(2):287~308

二级参考文献9

共引文献46

同被引文献125

引证文献6

二级引证文献227

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部