摘要
支撑杆在滑模中所起的作用是重大的,施工时由于模板脱模的时间、混凝土振捣的质量、振捣器插入的深度、钢筋保护层厚度不匀等都会影响砼的质量问题或引发安全事故。
Supporting bars play an important role in sliding mould construction. During the construction, the time for mould board releasing, the quality of vibrated concret, the depth of vibrator inserting, the bad - distributed thickness of reinforcing bar protector,will decide the quality of the construction directly.
出处
《鸡西大学学报(综合版)》
2006年第2期75-76,共2页
JOurnal of Jixi University:comprehensive Edition
关键词
支撑杆
模板
振捣
保护层
supperting bar
mould board
vibrate
protector