糯扎渡水电站排水洞开挖支护经验浅谈 被引量:3

Comments on Supporting System for the Excavation of Discharge Tunnels in Poor Geological Conditions of Nuozhadu Hydropower Station
在线阅读 下载PDF
导出
摘要 不良地质条件下,开挖支护采用一般的支护如超前锚杆、系统锚杆、挂网喷混凝土等方法已经无法满足施工要求,必须采用更强的支护方法。在糯扎渡水电站排水洞工程中采用挂网喷混凝土结合钢支撑支护或挂网喷混凝土结合钢支撑及管棚法支护,取得了良好的效果。 Under unfavorable geological conditions, the regular supporting system such as advanced anchorage bolts, systematic anchorage bolts, wire mesh and grouting and etc., can no longer meet the construction requirement. So a more adequate supporting system is called for. In the excavation of the discharge tunnel of the Nuozhadu hydroelectric project, the wire mesh shotcreting was used in corporation with the steel supporting or wire mesh grouting with steel supporting and pipeshield supporting system. The resuh was satisfactory.
作者 韦顺敏
出处 《水力发电》 北大核心 2006年第4期37-38,60,共3页 Water Power
关键词 不良地质条件 支撑支护 管棚法 糯扎渡水电站 poor geological conditions supporting system pipe shielding Nuozhadu Hydropower Station
  • 相关文献

同被引文献8

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部