对华能威海电厂引进型300MW机组7、8号低压加热器(低加)疏水系统长期存在的疏水阻滞原因进行了分析,并根据现场条件制定出合理的改造方案。实施改造后,取得了良好的效果。
The causes of drain blockage existing in drainage system of low-pressure heaters no.7 and 8 concerning imported 300 MW unit for a long term in Huaneng Weihai Power Plant have been analysed, and reasonable retrofitting scheme being put forward based on conditions in the field. After implementation of the said scheme, good result has been obtained.