期刊文献+

地铁内排水泵站的设置 被引量:6

How to Set the Drainage Pump Station in Underground Railway
在线阅读 下载PDF
导出
摘要 介绍了地铁内排水泵站的设置原则,以及各类泵站的设置位置、泵站最大排水量、集水池有效容积大小、泵站应采取的监控方式等方面的内容。应在考虑可能的施工方法、正常运营和事故情况下可能产生的废水量、泵站失去工作能力时对地铁影响等因素的基础上,再确定泵站的能力、控制方式、设备选型等。 Based on the experiences of metro drainage system design in Shanghai, Najing and Shenzhen,as well as the understanding of the updated Code for Metro Design, this paper gives a brief description of how to set pump stations in underground railway, including the location of the pump stations, the capacity of the pump stations, the effective dimension of water collecting tank and the relevant supervision and control methods for different pumps. The author holds this research can serve as a reference for the design of metro drainage project.
作者 曾国保
出处 《城市轨道交通研究》 2006年第4期60-62,共3页 Urban Mass Transit
关键词 地铁 排水泵站 集水池 metro, drainage pump station, water collecting tank
  • 相关文献

参考文献4

  • 1北京市市政设计院.给水排水设计手册第五册城市排水[M].北京:中国建筑工业出版社,1986.
  • 2GB50157-2003.地铁设计规范[S].[S].,..
  • 3GBJ15-88.建筑给水排水设计规范[S].[S].,..
  • 4GB50054-95.低压配电设计规范[S].[S].,..

共引文献976

同被引文献46

  • 1李铁鹰,李新,王显.自控泵站集水池容积的计算问题探讨[J].中国给水排水,1995,11(6):19-23. 被引量:1
  • 2涂小华.广州地铁2号线的给排水设计[J].都市快轨交通,2005,18(4):146-149. 被引量:2
  • 3黄群初,陈金锥.污水泵站集水池相关设计水位的确定[J].水科学与工程技术,2006(6):44-45. 被引量:3
  • 4GB50014-2006室外排水设计规范[S].2005.
  • 5GB50336-2002.建筑中水设计规范[S].[S].,..
  • 6GB50157-2003.地铁设计规范[S].[S].,..
  • 7铁道第四勘察设计院.上海市轨道交通10号线工程环境影响报告书[R].武汉:铁道第四勘察设计院,2005.
  • 8铁道第二勘察设计院.深圳市城市轨道交通二期3号线工程环境影响报告书[R].成都:铁道第二勘察设计院,2004.
  • 9铁道第四勘察设计院.广州市轨道交通四号线工程环境影响报告书[R].武汉:铁道第四勘察设计院,2004.
  • 10张中和.给水排水设计手册第五册[M].北京:中国建筑工业出版社,2004.

引证文献6

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部