针对衡水电厂二期工程2台300 MW机组汽轮机控制系统在调试中存在的问题,对汽轮机控制系统有关设计逻辑进行了必要修改完善,通过现场试验满足了机组各种运行工况的要求,取得了良好效果。
Aiming at the problems in commissioning of the turbine control system of Hengshui power plant 2×300 MW unit, the relevant design logic of turbine control system was modified and perfected indispensably. Through on - the - spot tests, it is proved that can meet all kinds of operating performances and also gained satisfied effects.