介绍了水力机组的过渡过程种类,分析了抽水蓄能电站可逆式机组水泵工况下过渡过程的特性。
The kinds of transient process of hydraulic generator were introduced. The characteristic of the transient process of reversible unit under water pump condition of in pumped-storage station was analyzed.