6Roger Cline. Maintenance Scheduling for Electrical Equipment [Z]. United States Depart-Ment. of the Interior Bureau of Reclamation, Denver, Colorado. Http://www. usbr. gov/power/data/fist/fist4 _ lb/fist4 _ 1b. pdf.
7王嵘,李少鸣.战损油料装备抢修研究:硕士学位论文.解放军后勤工程学院.2008.
8赵翔.军用油料装备故障诊断妓术与应用[M].解放军后勤工程学院,2010.
9Li S J.Jioning of SiC Ceramics to Ni--Based Superalloy with Cu Intermediate Layer [J].Key Engineering Materials, 2002,27.
10Moore T J,et al.Joining NiA1 using simultaneous comstion synthesis and pressure [J]. Scripta Metallurgica et Materialia, 1994,30(4).